Skip to content

Upgrade 12c → 19c.

While production keeps running. Pick a method, press play and follow the database through every step.

    Applications offline

    Applications offline
    —
    Calendar time
    —
    Way back
    What it needs

    Three ways to 19c.

    The right one depends on how long your applications may be offline, and on what you already have.

    Side by side with GoldenGate

    about a minute

    Applications offline

    Way back
    Switch back to 12c in a minute with nothing lost, for as long as you keep it running.
    What it needs
    A second environment for 19c and GoldenGate for the length of the migration.
    Good for
    Systems that cannot stop, and moves to new hardware or to OCI.

    Rolling upgrade with a standby

    a few minutes

    Applications offline

    Way back
    Before the switch you discard the upgraded standby. After it you switch back.
    What it needs
    A Data Guard standby. Automating the procedure with DBMS_ROLLING needs Active Data Guard.
    Good for
    Systems that already have a standby and can pause for a few minutes.

    In place with AutoUpgrade

    about two hours

    Applications offline

    Way back
    Flashback to a restore point created just before the upgrade.
    What it needs
    No extra hardware and no extra licenses. A maintenance window.
    Good for
    Systems that can stop for an evening.

    Why 19c, and why now.

    A database that no longer receives fixes is a risk you carry every day.

    12.1
    12.2
    19c
    Premier Support Extended Support no error correction

    No more fixes for 12c

    Oracle ended regular error correction for 12c in 2022. On Sustaining Support a database receives no new security patches.

    19c is supported for years

    Premier Support runs until 31 December 2029 and Extended Support until 31 December 2032.

    One step from 12c

    You can upgrade to 19c directly from 12.1.0.2 and 12.2.0.1, and from 11.2.0.4 and 18c as well.

    The door to 26ai

    Oracle AI Database 26ai can be reached directly only from 19c or 21c. 19c is the stop you need either way.

    Questions we hear before every upgrade.

    Can we change hardware or move to OCI in the same step?

    Yes. With the side-by-side method the new 19c database can live anywhere: on new servers, on Exadata or Database Appliance, or in an OCI region. Upgrade and migration become one project with a single switch.

    Do we have to convert to a container database?

    Not for 19c. The older non-container architecture still works in 19c, although Oracle has deprecated it. Moving to a pluggable database now saves a second project later, and 19c lets you run up to three pluggable databases without the Multitenant option.

    What about licenses?

    The database licenses you own cover 19c, because new versions are part of your support contract. The side-by-side method needs GoldenGate for the length of the migration and the rolling method may need Active Data Guard. We size exactly what is required and can supply it.

    We still run 11g. Does this apply to us?

    It does. Release 11.2.0.4 upgrades directly to 19c with the same three methods.

    How long does the whole thing take?

    The technical work is a matter of days. Most of the calendar time is your own testing, and with the side-by-side method you decide how long that lasts, because production is not waiting for it.

    Article: what 19c changes, the license side and when 26ai makes sense

    Still on 12c?

    Tell us which version you run and how long your applications may be offline. We will tell you which method fits and what it would take.