Can we change hardware or move to OCI in the same step?
Yes. With the side-by-side method the new 19c database can live anywhere: on new servers, on Exadata or Database Appliance, or in an OCI region. Upgrade and migration become one project with a single switch.
Do we have to convert to a container database?
Not for 19c. The older non-container architecture still works in 19c, although Oracle has deprecated it. Moving to a pluggable database now saves a second project later, and 19c lets you run up to three pluggable databases without the Multitenant option.
What about licenses?
The database licenses you own cover 19c, because new versions are part of your support contract. The side-by-side method needs GoldenGate for the length of the migration and the rolling method may need Active Data Guard. We size exactly what is required and can supply it.
We still run 11g. Does this apply to us?
It does. Release 11.2.0.4 upgrades directly to 19c with the same three methods.
How long does the whole thing take?
The technical work is a matter of days. Most of the calendar time is your own testing, and with the side-by-side method you decide how long that lasts, because production is not waiting for it.